We were instructed to carry out a comprehensive Passive Fire Survey at the UTC College where it was identified that there were various service penetrations inadequately fire stopped, a report was issued highlighting the defects, we were instructed to carry out the necessary fire stopping, once complete, a Passive Fire Survey was issued once all the fire stopping works had been installed and an inspection sigh-off carried out.