We were delighted to have been invited to carry out a Passive Fire Stopping survey at the major refurbishment Project at Humber Bridge.
Following on from our survey, we produced a comprehensive Passive Fire Survey report detailing all required fire stopping points following the M&E works.
Our fire stopping works were carried out in two visit's, see gallery below of some examples of fire stopping works installed.